CFD Study Tunnel Ventilation
Task:
Examining & Improving ventilation in a stockpile tunnel system (length >250m)
Examining & Improving ventilation in a stockpile tunnel system (length >250m)
Scope of work:
- CFD study, mesh grid modelling up to 3.3 Mio. cells
- Examining & testing air ventilation
(according to ‚Mines Safety and Inspection Regulations 1995’) - Considering the setup of existing & new fans and dust removal system in detail
- Recommendations improving flow conditions
(avoiding dead zones, short-cut flows)