HVAC

tunnel_ventilation-1.jpg


CFD Study Tunnel Ventilation

Task:

Examining & Improving ventilation in a stockpile tunnel system (length >250m)

Scope of work:

  • CFD study, mesh grid modelling up to 3.3 Mio. cells
  • Examining & testing air ventilation
    (according to ‚Mines Safety and Inspection Regulations 1995’)
  • Considering the setup of existing & new fans and dust removal system in detail
  • Recommendations improving flow conditions
    (avoiding dead zones, short-cut flows)




cfd_wwt-1-e1724940465281-1280x335.jpg


CFD Study Optimisation Shed Ventilation

Task:

Optimisation ventilation & flow conditions in a shed for a waste water treatment covering an area up to 5.8 hectare

Scope of work:

  • CFD study
  • Mesh grid modelling (>8 Mio. cells)
  • Recommendations improving flow conditions & ventilation in the shed
    (avoiding dead zones, short-cut flows or similar)




05_icon_cfd_modellierung_kuehlhaus.jpg


CFD Analysis of Cooling Chamber

Task:

Modelling of energy loss and temperature distribution in a cooling chamber

Scope of work:

  • CFD modelling of transient flow considering a full opening cycle
  • Characterisation of the temperature distribution in the chamber.
  • Recommendations regarding minimisation of energy losses



YouTube

Mit dem Laden des Videos akzeptieren Sie die Datenschutzerklärung von YouTube.
Mehr erfahren

Video laden


GRAZ

Location

Reininghausstraße 13

8020 Graz, Österreich
+ 43 316 225 106

gridlab.at

Stay in contact

Contact us

Write to us via one of our channels. We will contact you.